lunes, 31 de marzo de 2008

Buenos aires: Day 4 : Subway

In 9 months quite some progress has been made on the Subway net. I have posted about it before. H - line (Yellow) is now almost (if not completely) done creating a second North - South connection crossing other already existing lines cutting short on travel time for a lot of people.

Line A (the oldest) which before stopped at Primera Junta has now been extended. I think u can travel up to Avenida Carabobo right now. Some stations are still in the making as the one i'm looking at right now: Plaza Flores. But above ground it seems pretty much done. I don't think it will take too long for that to complete.

There was another line i think P - line. I will have to check that out. So more about that later.